MARINE

Owen Park Seawall
Detroit MI

2025
  • Design/build seawall replacement project in conjunction with Mannik & Smith.
  • Furnish & Install 403 LFT of PZC 13 x 20′ long – 8,060 SFT.
  • Furnish & Install 269 LFT or 58 pair PZC 13 sheets for the dead man wall – 2,690 SFT.
  • Anchored wall includes double channel C12 walers, fixing plates/bolts, and 29 tie-rods @ 13′ O.C.
  • C15 channel cap was installed.
  • Excavation/backfill for tie-rods, main wall, and dead man wall – 1,000 tons.
  • Kayak launch and floating dock.
  • Fence structure complete.