MARINE
Owen Park Seawall
Detroit MI
2025
- Design/build seawall replacement project in conjunction with Mannik & Smith.
- Furnish & Install 403 LFT of PZC 13 x 20′ long – 8,060 SFT.
- Furnish & Install 269 LFT or 58 pair PZC 13 sheets for the dead man wall – 2,690 SFT.
- Anchored wall includes double channel C12 walers, fixing plates/bolts, and 29 tie-rods @ 13′ O.C.
- C15 channel cap was installed.
- Excavation/backfill for tie-rods, main wall, and dead man wall – 1,000 tons.
- Kayak launch and floating dock.
- Fence structure complete.