Celeron Island Restoration
Gibraltar, MI
2018 - 2019
- Furnish and place 45,000 tons of 8"–16" and 28"–36" rip rap in the construction seven (7) each stone shoals
-
Dredging of 12,000 cyds of in situ sand and construction of a
habit shoal to include plantings, seeding,
and live stakes - Furnishing and placing various habitat stone and log structures in the exiting inner bay area