ECKorneffelLogo
Previous
Next

BRIDGE/SOUND WALL

Oakland Avenue
Over M-8 (3 Bridge Package)
Detroit, MI

2015
  • Deck Replacement
  • Pin & hanger and bridge beam re-positioning
  • Epoxy overlay
  • Silica Fume deep overlay
  • Full Cleaning and Coating of bridge structure
Previous
Next

BRIDGE/SOUND WALL

Oakland Avenue
Over M-8 (3 Bridge Package)
Detroit, MI

2015
  • Deck Replacement
  • Pin & hanger and bridge beam re-positioning
  • Epoxy overlay
  • Silica Fume deep overlay
  • Full Cleaning and Coating of bridge structure