FCA Jeep Plant Sound Wall
Detroit, MI
2019
- Design/Build project for 7,500 LFT of sound wall for new FCA Jeep Plant
- Drill 326 each 3' dia. caissons
- Set four (4) anchor bolts up to 54," re-steel cages, and concrete fill in each caisson
- Procure, handle, and set 102,667 SFT of sound wall panel within eighty (80) days.
- 30,850 SFT of 10’ tall wall – 260 panels
- 51,405 SFT of 15’ tall wall – 286 panels
- 20,412 SFT of 18’ tall wall – 150 panels