• Text Hover
MDOT - Link Detroit 
( 4-bridge package) 
Detroit, MI

  • Demolition and reconstruction of four (4) bridges in Eastern Market, downtown Detroit
  • 25,000 LFT of h-piling installed
  • Substructure concrete and three (3) sided culverts replaced old bridges
  • Over 1,000 LFT of decorative parapet railing installed
  • Surface coating of all structures
  • Text Hover
  • Text Hover