• Text Hover
Detroit Riverfront Dock and Fishing Pier
Trenton, MI
2015 - 2106
  • Installation of nineteen (19) braced cofferdams consisting of 14 x 17PZ 27 cofferdams with one (1) level of bracing.
  • Installation of a 200 x 20stone filled pier 800 offshore consisting of PZ 27 sheeting piling with cast steel tips driven into rock including one (1) level of internal bracing and concrete surface. 
  • 19 each intermediate PZ 27 sheet pile cofferdams with rock tips, stone fill and concrete surface to support 750 of steel walkways, railings, boardwalks, electrical, and floating dock.
  • Text Hover
  • Text Hover