MARINE
Detroit Riverfront Conservancy
Detroit, MI
2019
- Furnish/Install 116 each 12hp53 x 100′ long galvanized piles
- Fully driven h-pile template system utilized to ensure accuracy for structural steel
- Complete fabrication/installation of 1000′ LFT of galvanized W14 x 34 structural steel, pin & hangers, metal decking, and studs
- Structural steel slab on grade and decorate concrete complete including expansion joints (4)
- Rigid galvanized pipe (RGP), waterproof junction boxes, security cameras, call stations, and 134 Luminaire light fixtures installed
- 988 each stainless steel posts, shroud/security fence, and fourteen (14) runs of cabling complete each side of the structure totaling 28,000 LFT
- 80 LFT of sheeting, excavation, concrete fill, and stone backfill for sinkhole remediation