MARINE
Celeron Island Restoration
Gibraltar, MI
2018-2019
- Furnish and place 45,000 tons of 8″–16″ and 28″–36″ rip rap in the construction seven (7) each stone shoals
- Dredging of 12,000 cyds of in situ sand and construction of a habit shoal to include plantings, seeding,
and live stakes - Furnishing and placing various habitat stone and log structures in the exiting inner bay area
MARINE
Celeron Island Restoration
Gibraltar, MI
2018-2019
- Furnish and place 45,000 tons of 8″–16″ and 28″–36″ rip rap in the construction seven (7) each stone shoals
- Dredging of 12,000 cyds of in situ sand and construction of a habit shoal to include plantings, seeding,
and live stakes - Furnishing and placing various habitat stone and log structures in the exiting inner bay area
PROJECTS
Grosse Pointe Yacht Club (GPYC) Phase 3A/3C : 2021/2022
Blossom Heath Park Pier: 2021/2022eckorneffel.com/blossom-heath-park-pier
Sugar Island Restoration: 2021-2023
DTE EES Coke – Emergency Shore Line Repair: 2021
Erma Henderson Park City of Detroit: 2021
Celeron Island Restoration: 2018-2019
Detroit Riverfront Conservancy: 2019
DTE Station A Remediation: 2018
PAST PROJECTS
Grosse Pointe Yacht Club: 2016-2017
Riverfront Dock & Fishing Pier: 2015-2016
Fort Street Over the River Bascule Bridge Replacement: 2013-2014