MARINE
Belleview Development
Detroit, MI
2011-2012
- 800’ of alternating 110’ W33 and W36 king pile interlocking with 80’ steel sheet piling
- Interlocks between WF beams and PZC sheeting have been treated with water tight sealant
- 125’ long HP14 battered raker piles providing tension (215 ton) and compression (215 ton) capacities
- Multiple cofferdams with up to three (3) levels of bracing including HP12 piles and mass concrete pour
- Concrete Cap
- Seawall to allow for site remediation
MARINE
Belleview Development
Detroit, MI
2011-2012
- 800’ of alternating 110’ W33 and W36 king pile interlocking with 80’ steel sheet piling
- Interlocks between WF beams and PZC sheeting have been treated with water tight sealant
- 125’ long HP14 battered raker piles providing tension (215 ton) and compression (215 ton) capacities
- Multiple cofferdams with up to three (3) levels of bracing including HP12 piles and mass concrete pour
- Concrete Cap
- Seawall to allow for site remediation
PROJECTS
Grosse Pointe Yacht Club (GPYC) Phase 3A/3C : 2021/2022
Blossom Heath Park Pier: 2021/2022eckorneffel.com/blossom-heath-park-pier
Sugar Island Restoration: 2021-2023
DTE EES Coke – Emergency Shore Line Repair: 2021
Erma Henderson Park City of Detroit: 2021
Celeron Island Restoration: 2018-2019
Detroit Riverfront Conservancy: 2019
DTE Station A Remediation: 2018
PAST PROJECTS
Grosse Pointe Yacht Club: 2016-2017
Riverfront Dock & Fishing Pier: 2015-2016
Fort Street Over the River Bascule Bridge Replacement: 2013-2014