MARINE
Riverside Park Seawall
Detroit, MI
2025
- Furnish & Install 390 LFT of PZC18 x 50′ long sheeting – 19,500 SFT.
- Furnish & Install 316 LFT of PZC13 x 20′ long dead man wall – 6,319 SFT.
- Upstream and downstream tie-ins to existing relieving platforms engineered and installed:
• PZ 40/PZC18 sheeting piling.
• Corner walers/tie-rods.
• Wood piling/concrete debris/rip rap removed. - Clearing the driving line included in 25′ of water.
- Anchored wall includes double channel C12 walers, fixing plates/bolts, and tie-rods @ 9′ O.C.
- C18 channel cap installed.
- Excavation/backfill for tie-rods, main wall, and deadman wall – 4,000 tons.