DTE River Rouge Power Plant - Decontamination & Demolition
River Rouge, MI
2024
- Revisions to the Intake Structure:
• Installation and removal of skimmer structure w/appurtenances.
• Removal of trash racks.
• Furnish/install approx. 146 LFT of PCZ18 x 55′ long with waler and connecting to existing pipe struts.
• Furnish/Install approximately 5,300 tons of 1x3stone/ riprap.
• Restoration of bank. - Revisions to the Outlet Canal Structure:
• Installation of SSP Outlet Control Structure with steel framing and valves.
• Removal of steel sheet pile structure and appurtenances.
• Installation of 16″ pipe.
• Installation of approximately 5,500 tons of 1x3stone/riprap.
• Restoration of bank. - Removal of Dock Structure:
• Includes the removal and disposal of seventeen (17) pile clusters.
• Removal and disposal of approx. 700 LFT of dock structure including decking, railing, bracing, support structure and steel cable.
• Removal and disposal of Oil Onloading Building Foundation. - Shoreline restoration at Outfall 005 includes clearing of all vegetation and installation of 1,025 tons of 1×3 stone/heavy riprap