MARINE

Riverside Park Seawall
Detroit, MI

2025
  • Furnish & Install 390 LFT of PZC18 x 50′ long sheeting – 19,500 SFT.
  • Furnish & Install 316 LFT of PZC13 x 20′ long dead man wall – 6,319 SFT.
  • Upstream and downstream tie-ins to existing relieving platforms engineered and installed:
    • PZ 40/PZC18 sheeting piling.
    • Corner walers/tie-rods.
    • Wood piling/concrete debris/rip rap removed.
  • Clearing the driving line included in 25′ of water.
  • Anchored wall includes double channel C12 walers, fixing plates/bolts, and tie-rods @ 9′ O.C.
  • C18 channel cap installed.
  • Excavation/backfill for tie-rods, main wall, and deadman wall – 4,000 tons.