MARINE

Harrison Township Waterfront Park Pier
Harrison Township, MI

2024/2025
  • Construction of a new pipe pile supported fishing pier:
    • Use of a barge and crane with a full template system.
    • Furnish and install 31 each concrete filled 12″ pipe x .312 wall x 45′ long
    • Steel supports and top plates installed to attach treated timber headers for the deck.
    • Furnish and install treated timber substructure and decking complete with bench structures.
    • Furnish and install underground power and service leading to dock lighting.
  • 279 LFT of shoreline remediation including the placement of 1300 tons of 4×8 stone and MDOT plain rip rap.
  • Installation of concrete plank kayak launch ramp.
  • Temporary sheeting piling utilized to install a new 36″ dia. outfall with fabric and stone base.
  • Temporary road, site work, bioswales, concrete sidewalks, restoration.