MARINE
Grosse Pointe Yacht Club (GPYC)
Phase 3A/3C
Grosse Pointe Shores, MI
2021/2022
- Complete design work for harbor reconstruction project since 2012 – 4th phase of five (5) total phases.
- Full demolition of existing T dock, Moby/Gas/Hickory complete (113 boat slips).
- Installation of 450’ of galvanized PZC13 x up to 35’ long with # 14 tie-rods tied, C12 x 20 double channel walers and 1,000 tons of stone. Form/pour/cure a 1’ thick reinforced concrete walkway.
- New pile supported galvanized electronically operated swing bridge (north harbor) on 16” pipe piles
- 6 new pipe pile supported galvanized docks for 12 new slips with 35’ long Class A/B piles
- 113 new floating docks up to 55’ long manufactured by FDS with 6’x 6 uprights
- 161 class A/B wood piles in between all floating docks
- 1,500 yards of harbor dredging.
- Installation of new gas dock with APT piping and four (4) new dispensers.
- Site work, concrete, electrical, plumbing, and pump out complete.
MARINE
Grosse Pointe Yacht Club (GPYC)
Phase 3A/3C
Grosse Pointe Shores, MI
2021/2022
- Complete design work for harbor reconstruction project since 2012 – 4th phase of five (5) total phases.
- Full demolition of existing T dock, Moby/Gas/Hickory complete (113 boat slips).
- Installation of 450’ of galvanized PZC13 x up to 35’ long with # 14 tie-rods tied, C12 x 20 double channel walers and 1,000 tons of stone. Form/pour/cure a 1’ thick reinforced concrete walkway.
- New pile supported galvanized electronically operated swing bridge (north harbor) on 16” pipe piles
- 6 new pipe pile supported galvanized docks for 12 new slips with 35’ long Class A/B piles
- 113 new floating docks up to 55’ long manufactured by FDS with 6’x 6 uprights
- 161 class A/B wood piles in between all floating docks
- 1,500 yards of harbor dredging.
- Installation of new gas dock with APT piping and four (4) new dispensers.
- Site work, concrete, electrical, plumbing, and pump out complete.
PROJECTS
Grosse Pointe Yacht Club (GPYC) Phase 3A/3C : 2021/2022
Blossom Heath Park Pier: 2021/2022eckorneffel.com/blossom-heath-park-pier
Sugar Island Restoration: 2021-2023
DTE EES Coke – Emergency Shore Line Repair: 2021
Erma Henderson Park City of Detroit: 2021
Celeron Island Restoration: 2018-2019
Detroit Riverfront Conservancy: 2019
DTE Station A Remediation: 2018
PAST PROJECTS
Grosse Pointe Yacht Club: 2016-2017
Riverfront Dock & Fishing Pier: 2015-2016
Fort Street Over the River Bascule Bridge Replacement: 2013-2014