DTE Trenton Channel Power Plant
Toledo, OH

2023
  • Design/build sheet pile construction to assist in the decommissioning of the Trenton Channel coal fired power plant.
  • Furnish/install 264 pairs of PZ27 hot rolled sheeting in a double wall configuration.
  • Interlock sealant is provided for watertight seal.
  • Internal waler system consisting of bolted/welded 14hp73 walers.
  • Furnish/install 3800 tons of compacted stone fill in the cofferdam.