MARINE
Blossom Heath Park Pier
St. Clair Shores, MI
2021/2022
- New offshore pier construction
-
- Three (3) cofferdams – 7,000 SFT of PZC13
- 26 each 20” pipe piles x 50’ long with W14 supporting headers
- Structural steel complete with full composite decking
- 2,000 tons of rip rap
- Shade structures
- Landscape feature
-
- 600 LFT of new PZ 27 sheet piling
- New 375’ long boardwalk supported on 60 each pipe piles
- New custom railing provided manufactured and installed by Future Fence
- 2,000 tons of additional rip rap for tie protection
- Site work, landscaping, pavers, railings, electrical complete
- New concrete and HMA parking lot
MARINE
Blossom Heath Park Pier
St. Clair Shores, MI
2021/2022
- New offshore pier construction
-
- Three (3) cofferdams – 7,000 SFT of PZC13
- 26 each 20” pipe piles x 50’ long with W14 supporting headers
- Structural steel complete with full composite decking
- 2,000 tons of rip rap
- Shade structures
- Landscape feature
-
- 600 LFT of new PZ 27 sheet piling
- New 375’ long boardwalk supported on 60 each pipe piles
- New custom railing provided manufactured and installed by Future Fence
- 2,000 tons of additional rip rap for tie protection
- Site work, landscaping, pavers, railings, electrical complete
- New concrete and HMA parking lot
PROJECTS
Grosse Pointe Yacht Club (GPYC) Phase 3A/3C : 2021/2022
Blossom Heath Park Pier: 2021/2022eckorneffel.com/blossom-heath-park-pier
Sugar Island Restoration: 2021-2023
DTE EES Coke – Emergency Shore Line Repair: 2021
Erma Henderson Park City of Detroit: 2021
Celeron Island Restoration: 2018-2019
Detroit Riverfront Conservancy: 2019
DTE Station A Remediation: 2018
PAST PROJECTS
Grosse Pointe Yacht Club: 2016-2017
Riverfront Dock & Fishing Pier: 2015-2016
Fort Street Over the River Bascule Bridge Replacement: 2013-2014