Severstal – PLTCM Project  
Dearborn, Michigan
2008
  • Furnishing and installation of 100' long King Piles interlocking with 70' steel sheeting piling
  • Continuous double 14hp117 walers with 30" to 36" pipe struts spanning 85' across the pit
  • Raker bracing cast into the 4' thick concrete mat
  • System was designed to support an excavation depth to 34' in soil conditions with unconfined compressive strengths of less than 500 psf
  • Rail car delivery unloading, handling, and transportation from ECK’s Trenton, MI rail facility