Ferndale Development of Troy
Ferndale, MI
2019
- 932 LFT of driven/drilled solider pile & lagging to support an excavation up to 21'
- Installation of 122 each 14hp73/14hp89/14hp102 piles up to 35' long
- 14hp102 double waler and 24" steel pipe pile struts up to 84' long each installed
- Furn/install 17,000 sft of lagging boards