Ford Pond & Pump House
Dearborn, MI
2019/2020

  • Furnish/Install a 66' diameter circular King Pile earth retention system (ERS) to support a 39’ excavation
  • Alternating W18 x 130 steel king piles interlocking with PZ 27 x 55' long
  • Four (4) levels of internal concrete ring bracing
  • Furnish and install two (2) each three sided sheet pile cofferdams internally braced
  • Furnished 100 lft of cantilevered steel sheet piling
  • 34 each 12hp53 piles x 72.5' long h-piles driven in a 39' excavation
  • Form/pour 4' thick tremie mat in the bottom of the circular cell