EARTH RETENTION
Levi Rail Car Unloading Pit
Burton, MI
2025
- Furnish & installed 185 LFT of PZC13/PZC18 sheets up to 35′ long for up to a 28′ excavation.
- Fabricated and installed up to two (2) levels of 14hp117 walers and corner struts bolted and welded.
- Installed 20 each 12hp53 h-piles with pile points and top plates.
- PDA testing was performing to verify up to 173 kips in compression and up to 90 kips in tension capacity.