Furnish and install four (4) each TERS pits for the new Henry Ford Hospital – 13,500 SFT
Pits are four (4) sided with one (1) level of HP12/HP14 walers/ struts:
• Pit 1 – Main elevator pit – 54′ x 51′ x 15′ deep
• Pit 2 – Service elevator pit – 97′ x 65′ x 14.5′ deep
• Pit 3 – 19′ x 133′ x 13.5′ deep
• Pit 4 – 27′ x 43′ x 11′ deep
3″ hardwood lagging was utilized for this solider pile TERS.
Soldier piles were driven and/or pre-drilled 2′ dia. holes.