EARTH RETENTION

DTW Pond 6 Stormwater Project
Romulus, MI

2024
  • 67,000 SFT of PZC 19 sheet piling in varying lengths w/interlock sealant.
  • Use of a template for the entire length of project.
  • Custom seawall cap furnish/installed over 2,000 LFT of the project.