MARINE
Fort Street Over the River
Bascule Bridge Replacement
Detroit, MI
2013-2014
- Installation of two (2) offshore cofferdams consisting of 55,000 square feet of sheeting braced on three (3) levels to facilitate the removal of the existing bascule bridge in the Rouge River.
- Installation of 16hp88 galvanized piles x 95’ long and 12 x 12 wood timbers on five (5) levels for a marine fendering system. The bottom two (2) levels were installed underwater.
- Four (4) each circular cells consisting of 95’ long PS31 sheet piling with associated bracing and concrete work.
- Install 12hp74 and 18hp204 h-piles x 88’ long for the new bridge supports.
Previous slide
Next slide
MARINE
Fort Street Over the River
Bascule Bridge Replacement
Detroit, MI
2013-2014
- Installation of two (2) offshore cofferdams consisting of 55,000 square feet of sheeting braced on three (3) levels to facilitate the removal of the existing bascule bridge in the Rouge River.
- Installation of 16hp88 galvanized piles x 95’ long and 12 x 12 wood timbers on five (5) levels for a marine fendering system. The bottom two (2) levels were installed underwater.
- Four (4) each circular cells consisting of 95’ long PS31 sheet piling with associated bracing and concrete work.
- Install 12hp74 and 18hp204 h-piles x 88’ long for the new bridge supports.
PROJECTS
Grosse Pointe Yacht Club (GPYC) Phase 3A/3C : 2021/2022
Blossom Heath Park Pier: 2021/2022
Sugar Island Restoration: 2021-2023
DTE EES Coke – Emergency Shore Line Repair: 2021
Erma Henderson Park City of Detroit: 2021
Celeron Island Restoration: 2018-2019
Detroit Riverfront Conservancy: 2019
DTE Station A Remediation: 2018
PAST PROJECTS
Grosse Pointe Yacht Club: 2016-2017
Riverfront Dock & Fishing Pier: 2015-2016
Fort Street Over the River Bascule Bridge Replacement: 2013-2014