ECKorneffelLogo
Previous slide
Next slide

MARINE

Hennipin Restoration
Grosse Ile, MI

2022
  • Furnish and place 18,000 tons of 8″–16″ and 30″ rip rap in the construction two (2) each stone shoals
  • Furnishing and placing various habitat stone and log structures in the existing inner bay area to include plantings, seeding, and live stakes

Previous slide
Next slide

MARINE

Hennipin Restoration
Grosse Ile, MI

2022
  • Furnish and place 18,000 tons of 8″–16″ and 30″ rip rap in the construction two (2) each stone shoals
  • Furnishing and placing various habitat stone and log structures in the existing inner bay area to include plantings, seeding, and live stakes