Previous slide
Next slide
MARINE
Hennipin Restoration
Grosse Ile, MI
2022
- Furnish and place 18,000 tons of 8″–16″ and 30″ rip rap in the construction two (2) each stone shoals
- Furnishing and placing various habitat stone and log structures in the existing inner bay area to include plantings, seeding, and live stakes
Previous slide
Next slide
MARINE
Hennipin Restoration
Grosse Ile, MI
2022
- Furnish and place 18,000 tons of 8″–16″ and 30″ rip rap in the construction two (2) each stone shoals
- Furnishing and placing various habitat stone and log structures in the existing inner bay area to include plantings, seeding, and live stakes
PROJECTS
Grosse Pointe Yacht Club (GPYC) Phase 3A/3C : 2021/2022
Blossom Heath Park Pier: 2021/2022
Sugar Island Restoration: 2021-2023
DTE EES Coke – Emergency Shore Line Repair: 2021
Erma Henderson Park City of Detroit: 2021
Celeron Island Restoration: 2018-2019
Detroit Riverfront Conservancy: 2019
DTE Station A Remediation: 2018
PAST PROJECTS
Grosse Pointe Yacht Club: 2016-2017
Riverfront Dock & Fishing Pier: 2015-2016
Fort Street Over the River Bascule Bridge Replacement: 2013-2014