- Furnish/Install 116 each 12hp53 x 100′ long galvanized piles
- Fully driven h-pile template system utilized to ensure accuracy for structural steel
- Complete fabrication/installation of 1000′ LFT of galvanized W14 x 34 structural steel, pin & hangers, metal decking, and studs
- Structural steel slab on grade and decorate concrete complete including expansion joints (4)
- Rigid galvanized pipe (RGP), waterproof junction boxes, security cameras, call stations, and 134 Luminaire light fixtures installed
- 988 each stainless steel posts, shroud/security fence, and fourteen (14) runs of cabling complete each side of the structure totaling 28,000 LFT
- 80 LFT of sheeting, excavation, concrete fill, and stone backfill for sinkhole remediation
Previous slide
Next slide
MARINE
Detroit Riverfront Conservancy
Detroit, MI
2019
- Furnish/Install 116 each 12hp53 x 100′ long galvanized piles
- Fully driven h-pile template system utilized to ensure accuracy for structural steel
- Complete fabrication/installation of 1000′ LFT of galvanized W14 x 34 structural steel, pin & hangers, metal decking, and studs
- Structural steel slab on grade and decorate concrete complete including expansion joints (4)
- Rigid galvanized pipe (RGP), waterproof junction boxes, security cameras, call stations, and 134 Luminaire light fixtures installed
- 988 each stainless steel posts, shroud/security fence, and fourteen (14) runs of cabling complete each side of the structure totaling 28,000 LFT
- 80 LFT of sheeting, excavation, concrete fill, and stone backfill for sinkhole remediation
PROJECTS
Grosse Pointe Yacht Club (GPYC) Phase 3A/3C : 2021/2022
Blossom Heath Park Pier: 2021/2022
Sugar Island Restoration: 2021-2023
DTE EES Coke – Emergency Shore Line Repair: 2021
Erma Henderson Park City of Detroit: 2021
Celeron Island Restoration: 2018-2019
Detroit Riverfront Conservancy: 2019
DTE Station A Remediation: 2018
PAST PROJECTS
Grosse Pointe Yacht Club: 2016-2017
Riverfront Dock & Fishing Pier: 2015-2016
Fort Street Over the River Bascule Bridge Replacement: 2013-2014