Previous slide
Next slide

MARINE

Detroit Riverfront Conservancy
Detroit, MI

2019
  • Furnish/Install 116 each 12hp53 x 100′ long galvanized piles
  • Fully driven h-pile template system utilized to ensure accuracy for structural steel
  • Complete fabrication/installation of 1000′ LFT of galvanized W14 x 34 structural steel, pin & hangers, metal decking, and studs
  • Structural steel slab on grade and decorate concrete complete including expansion joints (4)
  • Rigid galvanized pipe (RGP), waterproof junction boxes, security cameras, call stations, and 134 Luminaire light fixtures installed
  • 988 each stainless steel posts, shroud/security fence, and fourteen (14) runs of cabling complete each side of the structure totaling 28,000 LFT
  • 80 LFT of sheeting, excavation, concrete fill, and stone backfill for sinkhole remediation
Previous slide
Next slide

MARINE

Detroit Riverfront Conservancy
Detroit, MI

2019
  • Furnish/Install 116 each 12hp53 x 100′ long galvanized piles
  • Fully driven h-pile template system utilized to ensure accuracy for structural steel
  • Complete fabrication/installation of 1000′ LFT of galvanized W14 x 34 structural steel, pin & hangers, metal decking, and studs
  • Structural steel slab on grade and decorate concrete complete including expansion joints (4)
  • Rigid galvanized pipe (RGP), waterproof junction boxes, security cameras, call stations, and 134 Luminaire light fixtures installed
  • 988 each stainless steel posts, shroud/security fence, and fourteen (14) runs of cabling complete each side of the structure totaling 28,000 LFT
  • 80 LFT of sheeting, excavation, concrete fill, and stone backfill for sinkhole remediation