BRIDGE/SOUND WALL
MDOT - Merriman Rd. Over Tarabusi Creek
Livonia, MI
2022
- Reconstruction of bridge under full closure
- Demolition of cast in place 3-span structure
- 12,500 SFT of steel sheet piling and 6,000 LF of 12hp53 h-piles
- New abutments (500 CYD), 27” box beams, wingwalls, deck (205 CYD), railing, approach slabs
- Excavation, backfill, utility location, and sewer work
- 800 tons of rip rap
BRIDGE/SOUND WALL
MDOT - Merriman Rd. Over Tarabusi Creek
Livonia, MI
2022
- Reconstruction of bridge under full closure
- Demolition of cast in place 3-span structure
- 12,500 SFT of steel sheet piling and 6,000 LF of 12hp53 h-piles
- New abutments (500 CYD), 27” box beams, wingwalls, deck (205 CYD), railing, approach slabs
- Excavation, backfill, utility location, and sewer work
- 800 tons of rip rap