BRIDGE/SOUND WALL
MDOT - Flamingo Rd.
St. Clair, MI
2021
- Design and Installation of temporary bridge prior to demolition of old structure
- Removal of old bridge once new temporary 1-way structure was complete
- 7,000 SFT of galvanized PZC13 sheeting in four (4) permanent cofferdams
- 12hp74 piles x 115’ long installed in four (4) cofferdams
- Galvanized re-steel, substructure, and tremie concrete complete
- Set and install 3-span treated wooden bridge including deck, curb, and railing
- Excavation, backfill, channel excavation, rip rap, and HMA
- Utility and sewer work
BRIDGE/SOUND WALL
MDOT - Flamingo Rd.
St. Clair, MI
2021
- Design and Installation of temporary bridge prior to demolition of old structure
- Removal of old bridge once new temporary 1-way structure was complete
- 7,000 SFT of galvanized PZC13 sheeting in four (4) permanent cofferdams
- 12hp74 piles x 115’ long installed in four (4) cofferdams
- Galvanized re-steel, substructure, and tremie concrete complete
- Set and install 3-span treated wooden bridge including deck, curb, and railing
- Excavation, backfill, channel excavation, rip rap, and HMA
- Utility and sewer work