BRIDGE/SOUND WALL
MDOT Bluebill Street Bridge
St. Clair, MI
2024
- Design and Installation of temporary bridge prior to demolition of old structure.
- Removal of old bridge once new temporary 1-way structure was complete.
- Four “L” shaped (4) quadrants and one (1) wall of new galvanized sheeting piling .
- Backwalls, 6 Tub girders, deck, railings, approach slabs.
- Excavation, backfill, channel excavation, rip rap, and HMA.
- Utility and sewer work.