BRIDGE/SOUND WALL

Jefferson Avenue Over The Huron River
Rockwood, MI

2023
  • Reconstruction of bridge under full closure.
  • 5,000 SFT of temporary PZC18 to remove the existing bridge piers.
  • 16,750 SFT of PZ 27 steel sheet piling w/rock tips for new abutment walls.
  • Center pier required 6 each galvanized 48″ casings w/drilled shaft and a 54″ x 54″ pier cap.
  • Installation of remaining 21 each permanent 48″ casings w/drilled shafts for the abutments.
  • Tremie seal in each abutment (400 CYD).
  • New abutments (502 CYD), 16 ea. 33″ box beams x 90′ long, wingwalls, deck (400 CYD), railing, approach slabs.
  • Excavation, backfill, utility location, and sewer work.
  • 600 tons of rip rap.
  • Multiple barges required to perform this work.