EARTH RETENTION
GLWA Fox Creek TERS
Detroit MI
2024/2025
- Design, furnish, and install multiple TERS pits with PZ 27 sheet piling.
- Lauch shaft – four (4) sided 33′ x 25′ pit x 50′ long sheeting:
• Two (2) levels of internal bracing to accommodate the TBM.
• Excavation depth of 35′.
• Intermediate wall/double waler l included to facilitate re-work of the existing outfall structure. - Outfall pit – four (4) sided 21′ x 27′ TERS pit with PZ 27 sheet piling
• Sequential TERS with adjacent pit to seal off existing outfall in the canal.
• PZ 27 x 30′ with interlocking sealant included.
• One (1) line of HP bracing.
• Watertight enclosure installed against an existing bridge with h-piles and rubber gaskets. - Canal Sheeting/Outfall Closure:
• 38 pair of PZ 27 x up to 25′ long sheeting.
• 45′ of PZ 27 x 35′ long to cutoff the canal upstream to allow for full dewatering.
• Seawall cap, backfill, and rip rap included. - • High flow conduit:
• 36 pair of PZ 27 sheeting in varying lengths from 35′ to 45′.
• Two (2) lines of HP walers, cross struts, and corner struts.
• Excavation depth ranging from 24′ to 30′ cut.
EARTH RETENTION
GLWA Fox Creek TERS
Detroit MI
2024/2025
- Design, furnish, and install multiple TERS pits with PZ 27 sheet piling.
- Lauch shaft – four (4) sided 33′ x 25′ pit x 50′ long sheeting:
• Two (2) levels of internal bracing to accommodate the TBM.
• Excavation depth of 35′.
• Intermediate wall/double waler l included to facilitate re-work of the existing outfall structure. - Outfall pit – four (4) sided 21′ x 27′ TERS pit with PZ 27 sheet piling
• Sequential TERS with adjacent pit to seal off existing outfall in the canal.
• PZ 27 x 30′ with interlocking sealant included.
• One (1) line of HP bracing.
• Watertight enclosure installed against an existing bridge with h-piles and rubber gaskets. - Canal Sheeting/Outfall Closure:
• 38 pair of PZ 27 x up to 25′ long sheeting.
• 45′ of PZ 27 x 35′ long to cutoff the canal upstream to allow for full dewatering.
• Seawall cap, backfill, and rip rap included. - • High flow conduit:
• 36 pair of PZ 27 sheeting in varying lengths from 35′ to 45′.
• Two (2) lines of HP walers, cross struts, and corner struts.
• Excavation depth ranging from 24′ to 30′ cut.