BRIDGE/SOUND WALL

Allen Rd. Bridge Over Blakely Drain
Brownstown, MI

2023
  • Reconstruction of bridge under full closure.
  • Installation of two (2) temporary cofferdams to remove the existing abutments.
  • 20 each 48″ Drilled shaft foundations.
  • Abutments (367 CYD), 12 Tub Girders, wingwalls, deck (500 CYD), railings, approach slabs.
  • Deck/approach pour done in one (1) night – 500 cubic yards.
  • Excavation, backfill, utility location, and sewer work.
  • 1400 tons of rip rap.