BRIDGE/SOUND WALL
Link Detroit
(4 Bridge Package)
Detroit, MI
2014
- Demolition and reconstruction of four (4) bridges in Eastern Market, downtown Detroit
- 25,000 LFT of h-piling installed
- Substructure concrete and three (3) sided culverts replaced old bridges
- Over 1,000 LFT of decorative parapet railing installed
- Surface coating of all structures