BRIDGE/SOUND WALL
Allen Rd. Bridge Over Blakely Drain
Brownstown, MI
2023
- Reconstruction of bridge under full closure.
- Installation of two (2) temporary cofferdams to remove the existing abutments.
- 20 each 48″ Drilled shaft foundations.
- Abutments (367 CYD), 12 Tub Girders, wingwalls, deck (500 CYD), railings, approach slabs.
- Deck/approach pour done in one (1) night – 500 cubic yards.
- Excavation, backfill, utility location, and sewer work.
- 1400 tons of rip rap.