MARINE
Lafarge
Toledo, OH
2019
- 500′ of NZ26 x 55′ long NZ 26 steel sheet piling from a barge
- Install twenty one (21) grouted tie-back anchors 8″ x 75′ long to a capacity of 180 kips
- Timber dolphin pile cluster and 20′ long laminated fenders installed on site
- Place over 1,000 yards of concrete annulus fill
- Sitework and concrete flatwork complete
MARINE
Lafarge
Toledo, OH
2019
- 500′ of NZ26 x 55′ long NZ 26 steel sheet piling from a barge
- Install twenty one (21) grouted tie-back anchors 8″ x 75′ long to a capacity of 180 kips
- Timber dolphin pile cluster and 20′ long laminated fenders installed on site
- Place over 1,000 yards of concrete annulus fill
- Sitework and concrete flatwork complete
PROJECTS
Grosse Pointe Yacht Club (GPYC) Phase 3A/3C : 2021/2022
Blossom Heath Park Pier: 2021/2022
Sugar Island Restoration: 2021-2023
DTE EES Coke – Emergency Shore Line Repair: 2021
Erma Henderson Park City of Detroit: 2021
Celeron Island Restoration: 2018-2019
Detroit Riverfront Conservancy: 2019
DTE Station A Remediation: 2018
PAST PROJECTS
Grosse Pointe Yacht Club: 2016-2017
Riverfront Dock & Fishing Pier: 2015-2016
Fort Street Over the River Bascule Bridge Replacement: 2013-2014