Grosse Pointe Yacht Club
Grosse Pointe Shores, MI
2016-2017
- Installation of 1,500’ of 30’ long galvanized sheet piling tied together with double channel walers and 7,000 tons of stone.
- New pile supported galvanized electronically operated swing bridge on 16” pipe piles.
- 28 new pipe pile supported galvanized docks for 56 new slips with 40’ long Class A/B piles.
- 1,500’ of new concrete walkway extending into Lake St. Clair.
- 2,600 yards of dredging.
- Site work, electrical, plumbing, pump out, and paving complete.
MARINE
Grosse Pointe Yacht Club
Grosse Pointe Shores, MI
2016-2017
- Installation of 1,500’ of 30’ long galvanized sheet piling tied together with double channel walers and 7,000 tons of stone.
- New pile supported galvanized electronically operated swing bridge on 16” pipe piles.
- 28 new pipe pile supported galvanized docks for 56 new slips with 40’ long Class A/B piles.
- 1,500’ of new concrete walkway extending into Lake St. Clair.
- 2,600 yards of dredging.
- Site work, electrical, plumbing, pump out, and paving complete.
PROJECTS
Grosse Pointe Yacht Club (GPYC) Phase 3A/3C : 2021/2022
Blossom Heath Park Pier: 2021/2022
Sugar Island Restoration: 2021-2023
DTE EES Coke – Emergency Shore Line Repair: 2021
Erma Henderson Park City of Detroit: 2021
Celeron Island Restoration: 2018-2019
Detroit Riverfront Conservancy: 2019
DTE Station A Remediation: 2018
PAST PROJECTS
Grosse Pointe Yacht Club: 2016-2017
Riverfront Dock & Fishing Pier: 2015-2016
Fort Street Over the River Bascule Bridge Replacement: 2013-2014