Riverfront Dock & Fishing Pier
Trenton, MI
2015-2016
- Installation of nineteen (19) braced cofferdams consisting of 14’ x 17’ PZ 27 cofferdams with one (1) level of bracing.
- Installation of a 200’ x 20’ stone filled pier 800’ offshore consisting of PZ 27 sheeting piling with cast steel tips driven into rock including one (1) level of internal bracing and concrete surface.
- 19 each intermediate PZ 27 sheet pile cofferdams with rock tips, stone fill and concrete surface to support 750’ of steel walkways, railings, boardwalks, electrical, and floating dock.
MARINE
Riverfront Dock & Fishing Pier
Trenton, MI
2015-2016
- Installation of nineteen (19) braced cofferdams consisting of 14’ x 17’ PZ 27 cofferdams with one (1) level of bracing.
- Installation of a 200’ x 20’ stone filled pier 800’ offshore consisting of PZ 27 sheeting piling with cast steel tips driven into rock including one (1) level of internal bracing and concrete surface.
- 19 each intermediate PZ 27 sheet pile cofferdams with rock tips, stone fill and concrete surface to support 750’ of steel walkways, railings, boardwalks, electrical, and floating dock.
PROJECTS
Grosse Pointe Yacht Club (GPYC) Phase 3A/3C : 2021/2022
Blossom Heath Park Pier: 2021/2022
Sugar Island Restoration: 2021-2023
DTE EES Coke – Emergency Shore Line Repair: 2021
Erma Henderson Park City of Detroit: 2021
Celeron Island Restoration: 2018-2019
Detroit Riverfront Conservancy: 2019
DTE Station A Remediation: 2018
PAST PROJECTS
Grosse Pointe Yacht Club: 2016-2017
Riverfront Dock & Fishing Pier: 2015-2016
Fort Street Over the River Bascule Bridge Replacement: 2013-2014