Previous slide
Next slide
MARINE
Detroit Wayne-County Port Authority
Detroit, MI
2010-2011
- Request and apply for a permit from the USACE and MDEQ
- Provide all design, surveying, layout, as-built information, and permits
- Furnish and install 28,000 sft of ZZ-26 700 steel sheet piling x 80′ long
- Furnish and install 9,000 sft of PZ-27 sheet piling x 30′ long
- Furnish and install perimeter steel wale brace along the main and dead men sheet pile walls
- Furnish and install steel tie-rods including any excavation and backfill with excavated materials
- Furnish and install 300 lft of steel channel cap
- Furnish and install 18 ea. 14hp73 h-piles x 80′ long driven to 120 tons capacity
Previous slide
Next slide
MARINE
Detroit Wayne-County Port Authority
Detroit, MI
2010-2011
- Request and apply for a permit from the USACE and MDEQ
- Provide all design, surveying, layout, as-built information, and permits
- Furnish and install 28,000 sft of ZZ-26 700 steel sheet piling x 80′ long
- Furnish and install 9,000 sft of PZ-27 sheet piling x 30′ long
- Furnish and install perimeter steel wale brace along the main and dead men sheet pile walls
- Furnish and install steel tie-rods including any excavation and backfill with excavated materials
- Furnish and install 300 lft of steel channel cap
- Furnish and install 18 ea. 14hp73 h-piles x 80′ long driven to 120 tons capacity
PROJECTS
Grosse Pointe Yacht Club (GPYC) Phase 3A/3C : 2021/2022
Blossom Heath Park Pier: 2021/2022
Sugar Island Restoration: 2021-2023
DTE EES Coke – Emergency Shore Line Repair: 2021
Erma Henderson Park City of Detroit: 2021
Celeron Island Restoration: 2018-2019
Detroit Riverfront Conservancy: 2019
DTE Station A Remediation: 2018
PAST PROJECTS
Grosse Pointe Yacht Club: 2016-2017
Riverfront Dock & Fishing Pier: 2015-2016
Fort Street Over the River Bascule Bridge Replacement: 2013-2014