PILING/DRILLING

DTE Puttygut Substation
East China, MI

2021
  • Furnish and install 203 ea. 12hp63 steel h-piles x 155′ long driven to 120 ton capacity
  • Furnish and install 160 ea. 14hp89 steel h-piles x 155′ long driven to 200 ton capacity
  • Perform 13 ea. PDA pile tests.
  • Furnish and install 203 ea. 12″ steel top plates and 160 ea. 14″ steel top plates