EARTH RETENTION
BNA Gordie Howe Bridge Cut Wall D Detroit, MI
2024/2025
Installation of 325 each spliced 14hp102 h-piles
Use of a template system for all piles was required.
201 of the 325 piles installed on a 3:1 batter
PDA testing included to confirm working load of 175 tons