PILING/DRILLING
DTE EES Coke - Flue Stack, Stairs and Manifold
Detroit, MI
2024
- Provide pile design, survey, layout and as-built information.
- Excavate, dewater, and investigate each pile and concrete cap location.
- Furnish/Install forty (40) each 12hp74x 80′ with pile points and top plates.
- Perform PDA testing to confirm capacities.
- Form/pour/strip eight (8) reinforced pile cap foundations.
- Reinforcing steel, anchor bolt assemblies, and 200 yards of concrete placed.