EARTH RETENTION

BNA Gordie Howe Bridge Cut Wall D Detroit, MI

2024/2025
  • Installation of 325 each spliced 14hp102 h-piles
  • Use of a template system for all piles was required.
  • 201 of the 325 piles installed on a 3:1 batter
  • PDA testing included to confirm working load of 175 tons

EARTH RETENTION

BNA Gordie Howe Bridge Cut Wall D Detroit, MI

2024/2025
  • Installation of 325 each spliced 14hp102 h-piles
  • Use of a template system for all piles was required.
  • 201 of the 325 piles installed on a 3:1 batter
  • PDA testing included to confirm working load of 175 tons