PILING/DRILLING
BNA - Livernois/Springwell's/Clark
I-75 Project
Detroit, MI
2020/2021
- Furnish and install 37,275 sft. of steel sheet piling for five (5) each earth retention systems
- Multiple lines of internal bracing, Deadman with tie-rods, and steel rakers
- Furnish and install 437 ea. 14hp102 ranging from 90′ long to 110′ driven to 300-ton capacity
- Vertical and batter piles with a 2.5 to 1 batter
- Perform 18 each PDA pile tests
Livernois
Springwells
Clark
PILING/DRILLING
BNA - Livernois/Springwell's/Clark
I-75 Project
Detroit, MI
2020/2021
- Furnish and install 37,275 sft. of steel sheet piling for five (5) each earth retention systems
- Multiple lines of internal bracing, Deadman with tie-rods, and steel rakers
- Furnish and install 437 ea. 14hp102 ranging from 90′ long to 110′ driven to 300-ton capacity
- Vertical and batter piles with a 2.5 to 1 batter
- Perform 18 each PDA pile tests
PROJECTS
PROJECTS
BNA – Green/Beard/Waterman I-75 Project: 2022
Ford Motor Company – REV Project: 2022
BNA – Livernois/Springwell’s/Clark I-75 Project: 2020/2021
Henry Ford Parking Garage: 2021
Ford Motor Company – BEV F150 Plant: 2020
MDOT 2nd Avenue Over I-94: 2020
PAST PROJECTS
Henry Ford Health System: 2018
Ford Wind Tunnel/Battery/ Lab: 2018