PILING/DRILLING
Central Energy Plant
Dearborn, MI
2018
- 305 each 24″ ACIP x 90′ long for the CEP Building (175 tons static/10 ton lateral)
- 197 each 24″ ACIP x 90′ long for the TES Tank (175 tons static/10 ton lateral)
- Two (2) Static Load & Two (2) lateral load test
- 98 each 14hp73 x 115′ long H-piles
- 45 each 12hp53 x 115′ long H-piles
PILING/DRILLING
Central Energy Plant
Dearborn, MI
2018
- 305 each 24″ ACIP x 90′ long for the CEP Building (175 tons static/10 ton lateral)
- 197 each 24″ ACIP x 90′ long for the TES Tank (175 tons static/10 ton lateral)
- Two (2) Static Load & Two (2) lateral load test
- 98 each 14hp73 x 115′ long H-piles
- 45 each 12hp53 x 115′ long H-piles
PROJECTS
PROJECTS
BNA – Green/Beard/Waterman I-75 Project: 2022
Ford Motor Company – REV Project: 2022
BNA – Livernois/Springwell’s/Clark I-75 Project: 2020/2021
Henry Ford Parking Garage: 2021
Ford Motor Company – BEV F150 Plant: 2020
MDOT 2nd Avenue Over I-94: 2020
PAST PROJECTS
Henry Ford Health System: 2018
Ford Wind Tunnel/Battery/ Lab: 2018