PILING/DRILLING

DTE EES Coke - Flue Stack, Stairs and Manifold
Detroit, MI

2024
  • Provide pile design, survey, layout and as-built information.
  • Excavate, dewater, and investigate each pile and concrete cap location.
  • Furnish/Install forty (40) each 12hp74x 80′ with pile points and top plates.
  • Perform PDA testing to confirm capacities.
  • Form/pour/strip eight (8) reinforced pile cap foundations.
  • Reinforcing steel, anchor bolt assemblies, and 200 yards of concrete placed.