PILING/DRILLING
BNA - Green/Beard/Waterman I-75 Project
Detroit, MI
2022
- Furnish and install 132 ea. 14hp102 in varying lengths from 90’ to 100’ long to 300-ton capacity
- Perform 12 ea. PDA Test piles
- Vertical and Batter piles with a 2.5 to 1 batter