BRIDGE/SOUND WALL

MDOT - Middlebelt Rd. Over Bell Creek
Livonia, MI

2022
  • Part width reconstruction of bridge
  • Demolition of 2-span reinforced structure
  • 7,500 SFT of steel sheet piling and 4,000 LF of 12hp53 h-piles
  • New abutments (270 CYD), 27” box beams, wingwalls, deck (250 CYD), railing, approach slabs
  • Excavation, backfill, utility location, and sewer work
  • 650 tons of rip rap