BRIDGE/SOUND WALL
Link Detroit
(4 Bridge Package)
Detroit, MI
2014
- Demolition and reconstruction of four (4) bridges in Eastern Market, downtown Detroit
- 25,000 LFT of h-piling installed
- Substructure concrete and three (3) sided culverts replaced old bridges
- Over 1,000 LFT of decorative parapet railing installed
- Surface coating of all structures
Previous slide
Next slide
BRIDGE/SOUND WALL
Link Detroit
(4 Bridge Package)
Detroit, MI
2014
- Demolition and reconstruction of four (4) bridges in Eastern Market, downtown Detroit
- 25,000 LFT of h-piling installed
- Substructure concrete and three (3) sided culverts replaced old bridges
- Over 1,000 LFT of decorative parapet railing installed
- Surface coating of all structures
PROJECTS
Goddard Rd. Over Sexton Kilfoil Drain: 2021
MDOT – Middlebelt Rd. Over Bell Creek: 2022
MDOT – Merriman Rd. Over Tarabusl Creek: 2022
East River Rd. Over North Hickory Canal: 2020
FCA Jeep Plant Sound Wall: 2019
River Rouge Oxbow Restoration Project – Phase III: 2018-2019
PROJECTS
Goddard Rd. Over Sexton Kilfoil Drain: 2021
MDOT – Middlebelt Rd. Over Bell Creek: 2022
MDOT – Merriman Rd. Over Tarabusl Creek: 2022
East River Rd. Over North Hickory Canal: 2020
FCA Jeep Plant Sound Wall: 2019
River Rouge Oxbow Restoration Project – Phase III: 2018-2019
Cherry Lawn Over I-96 Pedestrian Bridge: 2016
Oakland Avenue Over M-8 (3 bridge package): 2015
PAST PROJECTS