Previous slide
Next slide

BRIDGE/SOUND WALL

FCA Jeep Plant Sound Wall
Detroit, MI

2019
  • Design/Build project for 7,500 LFT of sound wall for new FCA Jeep Plant
  • Drill 326 each 3′ dia. caissons
  • Set four (4) anchor bolts up to 54,” re-steel cages, and concrete fill in each caisson
  • Procure, handle, and set 102,667 SFT of sound wall panel within eighty (80) days.
    • 30,850 SFT of 10’ tall wall – 260 panels
    • 51,405 SFT of 15’ tall wall – 286 panels
    • 20,412 SFT of 18’ tall wall – 150 panels
Previous slide
Next slide

BRIDGE/SOUND WALL

FCA Jeep Plant Sound Wall
Detroit, MI

2019
  • Design/Build project for 7,500 LFT of sound wall for new FCA Jeep Plant
  • Drill 326 each 3′ dia. caissons
  • Set four (4) anchor bolts up to 54,” re-steel cages, and concrete fill in each caisson
  • Procure, handle, and set 102,667 SFT of sound wall panel within eighty (80) days.
    • 30,850 SFT of 10’ tall wall – 260 panels
    • 51,405 SFT of 15’ tall wall – 286 panels
    • 20,412 SFT of 18’ tall wall – 150 panels